Download Print this page

Advertisement

Quick Links

Roll Bar
(1)Contents:
(2)Tools required:
a.17 mm Socket Wrench;
b.15 mm Socket Wrench;
c.13 mm Socket Wrench;
d.5 mm Allen Wrench;
BXG.5006

Advertisement

loading

Summary of Contents for HOOKE ROAD BXG.5006

  • Page 1 Roll Bar BXG.5006 (1)Contents: (2)Tools required: a.17 mm Socket Wrench; b.15 mm Socket Wrench; c.13 mm Socket Wrench; d.5 mm Allen Wrench;...
  • Page 2 About 2 hours, 2-3 people may be needed. Installation time may differ according to your mechanical skill level. (PLEASE VERIFY ALL PARTS ARE PRESENT AND READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION!) To view the electronic version (BXG.5006), please scan the QR code.
  • Page 3: Installation Instruction

    (4)Installation instruction: Step 1: Prepare the Installation by clear your pickup truck bucket. Step 2: Place the part H1 ,H2 and E.
  • Page 4 Step 3: Place the bolts in the truck slide way to install the part H1 and H2.
  • Page 6 Step 4: Assemble the part H1, H2 and E.
  • Page 7 Adjust the positions of part H1, H2 and E. Then tighten up all the bolts. Step 5: Assemble the part F1, G1, F2 and G2 into the structural frame.
  • Page 9 Step 6: Install the part A1, A2 and B.
  • Page 12 Step 7: Assemble the Part C1, C2, C3 and C4.
  • Page 13 Step 8: Assemble the part D.
  • Page 15 1.The product parts in this instruction may differ slightly from the actual product contents but generally does not affect the installation of the product. 2.Please feel free to contact your distributor if you have any kind of question about your purchase. Hooke Road to find your parts...