About This Document; Function Of This Document; Target Group; Revision History - ABB HVC-C 100-150 kW Installation Manual

Table of Contents

Advertisement

1

About this document

1.1

Function of this document

The document is only applicable for this EVSE (HVC-PU 100-150 kW Overnight),
including the variants and options listed in section 20.1.
The document gives the information that is necessary to install the EVSE.
1.2

Target group

The document is intended for qualified installation engineers.
For a description of the required qualifications, refer to section 3.4.
1.3

Revision history

Version
001
002
1.4

Language

The original instructions of this document are in English (EN-US). All other language
versions are translations of the original instructions.
1.5

Illustrations

It is not always possible to show the configuration of your EVSE. The illustrations in
this document show a typical setup. They are for instruction and description only.
1.6

Units of measurement

SI units of measurement (metric system) are used. If necessary, the document
shows other units between parentheses () or in separate columns in tables.
1.7

Typographical conventions

The lists and steps in procedures have numbers (123) or letters (abc) if the sequence
is important.
1.8

How to use this document

1. Make sure that you know the structure and contents of this document.
2. Read the safety chapter and make sure that you know all the instructions.
3. Do the steps in the procedures fully and in the correct sequence.
4. Keep the document in a safe location that you can easily access. This document
is a part of the EVSE.
6AGA000007-0611-EN | 002
Date
2021-10-08
About this document
Description
Initial version
Change in 15.11 point 5
9

Advertisement

Table of Contents
loading

Table of Contents