Prepare A Foundation For The Power Cabinet (Metal Frame); Prepare A Foundation For The Power Cabinet (Custom) - ABB HVC-C 100-150 kW Installation Manual

Table of Contents

Advertisement

Foundations
4. Guide the cables through the openings (D) in the foundation. Apply the full cable
slack.
5. Put cover plates (E) and (F) on top of the foundation (A).
6. Fill the open space around the foundation with sand or another filling material
to prevent rodents to enter the cabinet.
7.1.3

Prepare a foundation for the power cabinet (metal frame)

Preliminary requirements
Procedure
1. Mark the position of the holes (B) on
the ground. For the specifications,
refer to section
2. Drill and thread the holes.
3. Guide the cables to the cable trays (C).
4. Align the frame (A) with the threaded
holes.
5. Install the fasteners (D) with washers.
6. Tighten the fasteners to the correct
torque. For the specification, refer to
section
7.1.4

Prepare a foundation for the power cabinet (custom)

Preliminary requirements
40
Drill with screw tap
Torque wrench
20.9.2
.
20.5
.
Drill with screw tap
Metal frame. Refer to
20.9.2
section
.
If you have not included the
foundation in the initial
order, contact the
manufacturer to order the
foundation for your power
cabinet. Refer to section
1.12
.
Four fasteners M16 with
washers
A
C
6AGA000007-0611-EN | 001
D
B