Procedure
1. Strip the insulation from the cable
(A).
2. Prepare the wires:
a. Twist the shield mesh (B).
b. Strip the wires (C) and (D). For
c. Prepare two wire loops (E) and
d. Crimp a ferrule onto the end of
3. Make sure that unused wires are
protected and do not touch metal
parts.
4. Loosen the screws on the terminals
(G) to (J).
5. Connect these wires:
a. Interlock shield mesh (D) from the control box to the earthing terminal to the
b. Interlock in wire (C) from the interlock out of the control box, brown, to the
c. Interlock loop 2 out wire (D) to the interlock in of the control box, white, to
d. Wire loop (E) between the terminals X8-6 (M) and X8-7 (L)
e. Wire loop (F) between the terminals X8-10 (O) and X8-11 (N)
6. Tighten the terminal screws to the correct torque. For the specification, refer to
section
13.6

Connect the Ethernet cable

Preliminary requirements
Procedure
1. Guide the cable (A) to the CAN2ETH
board (B).
2. Connect the RJ45 plug to the terminal
J1 (C).
6AGA000007-0611-EN | 001
the specification, refer to
20.12.7
section
.
(F).
the wires and the shield mesh.
left of the X8-15 (J)
terminal X8-14 (G)
the terminal X8-15 (H)
20.5
.
Ethernet cable with the RJ45 plug. Refer to section
Electrical installation of the power cabinet
G
B
C
D
A
C
A
J
H L N
O
M
E
F
20.12.8