baltur TBML 80 MC Original Instructions Manual page 11

Mixed gas / diesel oil burner
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
ASSEMBLING THE GAS TRAIN
T h e r e a r e d i f f e r e n t w a y s o f a s s e m b l i n g t h e
v a l v e t r a i n , a s s h o w n i n d r a w i n g 0 0 0 2 9 3 6 4 0 0
Choose the most rational position for the set-up of the boil-
er room and the position in which the gas pipeline arrives.
In case of very large valves, e.g. DN65 or DN80, make sure
there is a suitable support to prevent excessive stress on
the gas train fitting.
ASSEMBLING VENTILATING UNIT
Position the half-hinge on the burner scroll in line with those on
the combustion head assembly.
Put the hinge pin 10 in the position considered most suitable.
Connect the cable switch on to the corresponding electrodes,
close the hinge, locking the burner by means of screws 11.
Insert the gas throttle control lever on the shaft and block it with
the specific nut.
COMPLETING BURNER SETUP
Remove the protective (yellow) caps from the couplings placed
beneath the head unit and near the electrovalves.
Connect the 12 light oil pipes provided with the burner to their
corresponding connectors, making sure they are properly sealed.
.
9 / 34
0006081545_201305

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbml 120 mcTbml 160 mcTbml 200 mc

Table of Contents