Zepro ZHZ 500 Installation Instruction page 21

Hide thumbs Also See for ZHZ 500:
Table of Contents

Advertisement

ZHZ 500/600-850
Installation
5.12
Connection box
If more than three controllers are to be connected or if two controllers with two-handed grip are to be con-
nected, a connection box must be fitted.
1. Install the connection box in an appropriate location.
2. When fitting, the drainage tube must be facing downwards, see Fig 28.
3. Connection is described later in section 7.
Connection box
Circuit board
Drainage tube
Cover
Fig 28. Connection box
www.zepro.com
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zhz 600Zhz 850

Table of Contents