Download Print this page

Finnleo Euro Outdoor Series Owner's Manual page 11

Advertisement

45. Mark and cut the left and right-side flashing
flush with front edge of roof. This cut should be
made at a slight angle.
46. Secure left and right-side flashing to fascia with
sheet metal/roofing screws.
47. Mark and cut the front ridge with a ¼" of overhang on each side.
48. Install front flashing to the roof so there is ¼" of overhang on each
side. Secure on top with sheet meal/roofing screws, one 5-1/2"
from each edge and the remaining two centered in between.
Secure to fascia with roofing screws.
49. Before screwing down the front flashing, insert the seal on top of
roofing metal and underneath the front flashing.
Note: Suggested to caulk seams at flashing joints.
71-0156
Rev. 03
Page 11
4215-136
10/21/2022

Advertisement

loading