Tesla Ldu Inverter Control Board Installation - AEM 30-8402 Installation Manual

Tesla ldu inverter control board
Table of Contents

Advertisement

Tesla LDU Inverter Control Board Installation

The following describes how to install the Control Board into the Tesla inverter. Start by putting the drive unit on a steady work
surface in a position that allows access to the bottom side of the inverter. The motor end of the drive unit is very heavy and will
allow the drive unit to be placed on a strong work bench with the inverter end hanging off. Alternatively, the drive unit can be
suspended using an engine hoist, etc.
Be sure to exercise great caution when working beneath the drive unit.
The drive unit must be completely disconnected from any high voltage source.
Tools Required
·
4 mm Hex Key
·
Pry Tool
·
13mm Socket
·
T-30 Torx
·
T-10 Torx
Use hex key to completely unscrew protective cover retaining
screw.
Behind the cover are two rubber o-rings that seal passageways.
Carefully pry the cover away to disengage the o-rings and then
fully remove cover.
AEM Performance Electronics
2205 W 126th Street, Unit A
Hawthorne, CA 90250
Page 10 of 23
Phone (8am-5pm M-F PST): 310-484-2322
Fax: 310-484-0152
sales@aemev.com
tech@aemev.com

Advertisement

Table of Contents
loading

Table of Contents