3. Check:
• Shift cable operation
• Throttle cable operation
Improper Repeat from step 2.
4. Install:
• Grommet "1"
1
Installing the main wire harness
1. Install:
• Main wire harness
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Install the cover "1".
b. Route the main wire harness "2" through
the bottom cowling. See "Bottom cowling
(tiller handle model)" (5-8) or "Bottom
cowling (remote control model)" (5-9).
c. Connect the main wire harness coupler
(10-pin) "a", and then secure it using the
plastic tie "3".
d. Install the main wire harness "2" to the
clamp "4", and then fasten the main wire
harness "2" to the bracket "5" with a plastic
tie "6".
TIP:
Before fastening the main wire harness "2" to
the clamp "4" and the bracket "5", pull it to pre-
vent loosening.
1
3
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Installing the 6Y8 multifunction meter
harness (pigtail bus wire)
1. Remove the cap "1".
2. Route the pigtail bus wire "2" through the
bottom cowling.
3. Connect the coupler "a" to the coupler "b".
2
4. Remove the yellow tape "1" and caps "2".
5. Connect the trim sensor coupler "a".
2
1
2
3-8
Rigging grommet mounting
a
2
5
6
b
a
1
a
4