q. Connect the connectors "a" of the PTT
switch Red (R) lead, Sky blue (Sb) lead,
and Light green (Lg) lead (PTT model).
R
r.
Connect the connectors "a" of the neutral
switch Brown (Br) leads, and then install
the holders "1" and "2" and the bracket "3".
2
3
a
s. Install the shift cable "1", throttle cable "2",
clips "3", and cable clamps "4".
4
2
1
4
t.
Connect the alert indicator couplers "a"
and "b", and then install the cover "1".
u. Install the grease nipple "2", and then tight-
en it to the specified torque.
a
Lg
Sb
1
Br
2
1
3
3
3
2
A
1
4
Tiller handle (tiller handle model)
Grease nipple "2"
3.0 N·m (0.30 kgf·m, 2.2 lb·ft)
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
9-7
b
2
a
1