Pentair ISO PRO Installation, Operation And Maintenance Manual page 15

Iso 5199 standard centrifugal pumps
Table of Contents

Advertisement

ISO PRO Centrifugal Pump
Section 4..................................................................Transport and Storage
1. GOODS RECIEVING, UNPACKING AND INSPECTION
Check Equipment against delivery / shipping documents for its completeness. Check for any damages
caused due to transport. If any damage is found it should be reported to the carrier immediately.
Any shortage and/or damage must be reported immediately to Pentair Southern Cross and must be
received in writing within one month of receipt of the equipment. Later claims cannot be accepted.
Check any crate, boxes or wrappings for any accessories or spare parts that may be packed
separately with the equipment or attached to side walls of the box or equipment.
Inspect the preservative coating on various parts. If necessary, renew preservative in areas where it
has been rubbed or scraped.
Inspect all painted surfaces. If necessary, touch up the areas where paint has been chipped or
scraped. Paints and preservatives used are either Pentair Southern Cross standard or 'special' as
required by the contract specification. Refer to Pentair Southern Cross for the description of paints and
preservatives used on this order if needed.
Inspect all covers over pump openings and piping connections. If covers or seals for the covers are
damaged or lose, they are to be removed, and a visual inspection made of the accessible interior
areas for accumulation of foreign materials or water. If necessary, clean and preserve the interior parts
as noted above to restore the parts to the "as shipped" condition. Install or replace covers and fasten
securely.
2. HANDLING
Boxes, crates, pallets or cartons may be unloaded using fork-lift vehicles or slings dependent on their
size and construction.
15