Drain Hole Position; Installation Space Requirements - EAS Electric M-THERMAL 2 BIBLOCK Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

6.3 Drain hole position

This drain hole is covered by rubber
plug. If one drain hole can not meet the
drainage requirements, the other one
can be used at the same time.
4/6 kW
It's necessary to install an electrical heating belt if water can't drain out in cold weather even the big drain hole has
opened.
It is suggested to site the unit with the base electric heater.

6.4 Installation space requirements

6.4.1 In case of stacked installation
1) In case obstacles exist in front of the outlet side.
≥500mm
A
Unit
4~16kW
It's necessary to install the water outlet connection pipe assembly if the unit is mounted on the top of each other,
preventing condensate flow to the heat exchanger.
6.4.2 In case of multiple-row installation
1) In case of installing one unit per row.
Drain hole
Fig: 6-5
CAUTION
≥200mm
Fig: 6-6
A(mm)
≥2000
NOTE
10
This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big one can be used at the same time.
8/10/12/14/16 kW
2) In case obstacles exist in front of the air inlet.
≥500mm
Drain hole
≥200mm
≥300mm
V.2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Eth10vaEth12vaEth12va-triEth16vaEth16va-tri

Table of Contents