September 2022
7. Press the Complete button. Verify that the Install State is Off and
Installed is ticked in the footer on the right side of the application.
Figure 4-3: Installation Tool Screen: Fully Provisioned
8. Remove the CC21 and fit the power module, tightening the two
power module retaining bolts.
When the power module is fitted, the sensor restarts and tries to join
the WirelessHART
join can often take 2 hours, and sometimes up to 6 hours.
9. Sensor installation is complete.
Quick Start Guide
®
gateway. In a large network of 100 sensors, this
Quick Start Guide
17