Download Print this page

Landoll 4620-24 Operator's Manual page 57

Folding seeder

Advertisement

Roller Clamp Tightening
Tighten the Clamp Socket Head Bolt. Torque to 75ft/lbs.
Thereafter check assemblies every 50-100 hours. See
Figure 5-5. Clamps must be assembled with the open
section straddling the welded seam of the drum pipe.
NOTE
Failure to locate the clamp band bolt over the weld will
cause clamp band to loosen and slide.
Figure 5-5: Roller Clamp Tightening
F-886-0322
TABLE OF CONTENTS
Servicing Seed Shaft
Assembly
IMPORTANT
The clutch must be disengaged (power off) when
Seed Shafts are turned manually.
After you have serviced a Seed Shaft, Seed Meters or
related components you will need to Zero out the Seed
Meters to ensure that you are seeding uniformly. Refer to
Seed Meter Adjustment. The following is a list of things to
be conscience of when re-assembling the Seed Shafts.
Ensure that the Thrust Washers are adjacent to Seed
Meter Feed Cut Offs and Spacers or Square Bore
Collars. See Figure 5-6.
Sq Bore
Collar
Thrust
Washer
Ensure RH Seed Shaft is threaded into the Feed Roll
Coupling Assembly between 1/2" to 3/4". Seed Shaft
should be visibly past the set screw hole when the
set screw is removed from the Coupler. Tighten Feed
Roll Coupler Assembly Set Screws against the flats
of the Seed Shaft.
Ensure that the Seed Shaft can turn freely without
any binding when the Seed Meters are open or
closed after servicing. You may need to make
adjustments to the Seed Meter Supports at each
Seed Meter.
Feed
Feed
Figure 5-6: Seed Shaft Assembly
MAINTENANCE
Seedshaft
5-5

Advertisement

loading

This manual is also suitable for:

Ss-24