3. Operation Cautions

Be care of the safety use. Don't attempt to release the connector when battery is on power.
Try to avoid hitting.
Don't split the waterproof sticker to avoid affecting the waterproof performance.
Don't modify system parameters to avoid parameters disorder.
Make the display repaired when error code appears.

4. Installation Instruction

Fix the display onto the handlebar and adjust to an appropriate visual angle. Tighten all the
connectors.

5. Normal Operation

5.1 Power On/Off

Hold Mode button for 2 seconds then the display will power on, and the display will the power
on the controller. With display on, hold MODE to turn off power supply of the e-bike. With the
display off, the display and controller shut down. The leakage current is less than 1 uA.
When parking e-bike for more than 10 minutes, the display shut down automatically.
KING-METER TECHNOLOGY CO., LTD
No.15, Chenchang Road, Beichen Dist.Tianjin,300134,CN
Fax:+0086 022 8478 0358 Tel: +0086 022 8478 0378