Goodwe EH Series Manual

Goodwe EH Series Manual

Hybrid inverter
Hide thumbs Also See for EH Series:

Advertisement

Quick Links

PV Master APP
SEMS Portal APP
SEMS Portal website
www.semsportal.com
JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO.,LTD
No.90 Zi Jin Road, SND, Jiangsu, China.
www.goodwe.com
service@goodwe.com
LinkedIn
Company's
offical website
EH SERIES USER MANUAL
HYBRID INVERTER
Rev.1.2
2021-01-08

Advertisement

Table of Contents
loading

Summary of Contents for Goodwe EH Series

  • Page 1 PV Master APP SEMS Portal APP SEMS Portal website LinkedIn Company's www.semsportal.com offical website EH SERIES USER MANUAL JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO.,LTD HYBRID INVERTER No.90 Zi Jin Road, SND, Jiangsu, China. Rev.1.2 www.goodwe.com 2021-01-08 service@goodwe.com...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS INTRODUCTION 1.1 OPERATION MODES INTRODUCTION 1.2 SAFETY & WARNINGS 1.3 PRODUCT OVERVIEW INSTALLATION INSTRUCTIONS 2.1 UNACCEPTABLE INSTALLATIONS 2.2 PACKING LIST 2.3 MOUNTING 2.3.1 SELECT MOUNTING LOCATION 2.3.2 MOUNTING 2.4 ELECTRICAL WIRING CONNECTION 2.4.1 PV CONNECTION 2.4.2 BATTERY CONNECTION 2.4.3 ON-GRID &...
  • Page 3: Operation Modes Introduction

    INTRODUCTION 1.2 SAFETY & WARNING The EH series hybrid inverter of Jiangsu GoodWe Power Supply Technology Co., Ltd. (here- GoodWe EH series, also called hybrid or bidirecational solar inverters, apply to solar inafter called as GoodWe) strictly comply with related safety rules for product design and system with participation of PV, battery, loads and grid system for energy management.
  • Page 4: Product Overview

    The temperature of inverter surface might exceed 60℃ during working, so please make sure it is cooled down before touching it, and make sure the inverter is untouchable for children Do not open inverter cover or change any components without GoodWe’s authorization, otherwise the warranty commitment for the inverter will be invalid.
  • Page 5: Installation Instructions

    INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 2.3 MOUNTING INSTALLATION INSTRUCTIONS 2.3.1 SELECT MOUNTING LOCATION 2.1 UNACCEPTABLE INSTALLATIONS For inverter’ s protection and convenient maintenance, mounting location for inverter should be selected carefully based on the following rules: Any part of this system shouldn’t block the switch and breaker to disconnected inverter from DC and AC power.
  • Page 6: Mounting

    • Please use PV plugs and connectors in right joint with mounting bracket. • For Ampheno/ connector, the limit buckle GoodWe accessory box cannot be pressed • PV cable should be standard, 2.5- 4mm • There will be a click sound if connectors are...
  • Page 7: Battery Connection

    Besides, do not remove necessary. Below are the requirements of On-Grid AC breaker. the battery plug and save the battery terminals, if lost, contact GOODWE for sale. Please be careful against any electric shock or chemical hazard.
  • Page 8 The inverter has filed adjustable setting like tripping point, tripping time, reconnect time, onto inverter 1. Please use the terminals in GoodWe active and invalid of QU/PU curves etc. by special firmware. Please contact GoodWe after components box; Note: Make sure it is connected to sales for the special firmware and adjust methods.
  • Page 9: Smartmeter & Ct Connection

    Declaration For Back-Up Loads Smart Meter & CT Connection Diagram (Pic 27) EH series hybrid inverters are able to supply over load output at its’ Back-Up. For details please refer to the technical parameters of EH series inverter (4.3 section). And the inverter has self-protection derating at high ambient temperature.
  • Page 10: Earth Fault Connection

    5kVA exported to grid limited by CT controller and power meter. GoodWe EH series inverter complies with IEC 62109-2 13.9. Fault indicator LED on If the generation facility to be connected to the supply network with more than 5 kVA power in inverter cover will light up and the system will email the fault information to customer.
  • Page 11: Wifi Configuration

    2. If everything is right well, the Wi-Fi LED on inverter will change from double blink to quartic blink the grid power to check whether the back-up function is normal, which can avoid the problems in then to solid status, which means Wi-Fi is connected to GoodWe icloud successfully. subsequent uses.
  • Page 12: Pv Master App Operation

    3.3 CEI AUTO-TEST FUNCTION Note: GoodWe will keep right to explain all the contents in this user manual. To insure IP65, inverter PV Auto-Test function of CEI is integrated in PV Master APP for Italy safety country must be sealed well, please install the inverters in one day after unpacking, otherwise please requirement.
  • Page 13: Error Message And Troubleshooting

    4. Try to restart the inverter, check if the fault is still happens, if not, means it is just an occasional situation, or contact GoodWe. Check use multi-meter if there is voltage value (normally should be close to 0V) between earth & inverter frame.
  • Page 14 OTHERS OTHERS Possible Problems During Operation • TROUBLESHOOTINGS Checking Before Turning On AC power No Discharge or Output From EH at Night Without PV or PV Power Lower Than Load Power: Solution: Battery Connection: Confirm the connection between EH and battery : polarity ( +/-)notreversed, 1.Communication between EH and Smart meter is OK or not.
  • Page 15: Technical Parameters And Certificates

    Q: Which battery should I use for EH? A: The shortest way, please refer to EH QUICK INSTALLATION INSTRUCTIONS and PV MASTER A:For EH series inverter, it could connect Lithium batteries which have compatibility with EH APP INSTRUCTION. series inverter. With nominal voltage from 85V to 450V.
  • Page 16 OTHERS OTHERS 4.3 TECHNICAL PARAMETERS AND CERTIFICATES Efficiency PV Max. Efficiency 97.60% TECHNICAL PARAMETERS OF EH INVERTER PV Europe Efficiency 97.00% PV Max. MPPT Efficiency 99.90% Technical Data GW6000-EH GW5000-EH GW3600-EH Battery Charged By PV Max. Efficiency 98.00% Battery Input Data Battery Charge/discharge From/To AC Max.
  • Page 17 OTHERS OTHERS *1: For CEI 0-21. 4.4 WARNING QUICK CHECK LIST *2: The grid feed in power for VDE-AR-N 4105 and NRS097-2-1 is limited 4600VA, for AS/NZS 4777.2 is limited 4950VA & [1] Inverter cannot be installed near flammable, explosive or strong electro-magnetic equipment, 21.7A.
  • Page 18: Checking The Electrical Connection

    OTHERS Environment Category Definition Environment Condition Ambient Temperature Relative Humidity Applied to -20~50℃ 4%~100% Outdoor -20~50℃ 5%~95% Indoor Unconditioned 0~40℃ 5%~85% Indoor Conditioned Pollution Degree Definition No pollution or only dry, non-conductive pollution occurs. The pollution has no infuence Pollution Degree Ⅰ Normally only non-conductive pollution occurs.

This manual is also suitable for:

Gw3600-ehGw5000-ehGw6000-eh

Table of Contents