September 2022
1
Before you begin
Before you begin the installation, consider the temperature limits of the
meter, which are: -20 F (-28.9C) to 160F (71.1C).
Figure 1-1: Exploded View
A. Transmitter
B. RTD assembly
C. Meter tube
D. RTD cable
E. Manifold
F. Stabilized connectors
G. Flow conditioner
The three steps to install and zero the Rosemount 9175 Natural Gas Flow
Meter are described in this guide:
Locate the installation point
Orient and install the flow meter
Trim the transmitter
Quick Start Guide
Quick Start Guide
5