Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
4 Initially Starting and Checking Rectifier Operation
4.1 Initially Starting the Rectifier
Procedure
1.
Verify all customer side DC load output connections are properly terminated, carefully paying attention to +/- DC polarity
at the output. Customer must verify DC polarity output to load before energizing rectifier.
2.
Apply AC input power to the rectifier by closing the external AC disconnect or protective device. The rectifier starts
automatically.
4.2 Checking Rectifier Status
Procedure
1.
Observe the status of the rectifier's local indicators (visible from the outside through a window located on the left side of
the rectifier). If operating normally, the status of these is as shown in Table 4.1. See Figure 5.1 for location.
Table 4.1 Status and Alarm Indicators
Indicator
Power (Green)
Protection (Yellow)
Alarm (Red)
38
Normal State
On
Off
Off