®
The Genesis Heat-Timer
installation process consists of the following basic steps:
1
Initial installation—Design Considerations.
2
Mounting the Genesis Heat-Timer
3
Locating and installing the sensors.
4
Connecting the Genesis Heat-Timer
•
Power wiring
•
Output wiring
•
Input wiring
5
Completing programming of the Genesis.
•
Hot Water Applications
•
Steam Applications
SUPPLIED MATERIALS
The following materials are supplied with the control:
•
Genesis Heat-Timer
®
control 926842–GENLT.
•
Two Temperature Sensors with Enclosures (P/N 904220–00.)
•
Three Wireless Space Temperature Sensors (P/N 904395–00.)
•
Wall Anchors and Screws.
•
Installation and Operation Manual (P/N 059705–00.)
•
Warranty Card (P/N 059115–00.)
REQUIRED MATERIALS
The following materials/tools are required for installation, but are not supplied:
•
General tool kit (screwdrivers, wire strippers, power drill, etc.)
•
18 AWG cable (Heat-Timer P/N 703001–01 or equivalent #18/2 cable).
DESIGN CONSIDERATIONS
When installing the system, certain design considerations must be taken into account. These include:
®
•
Genesis Heat-Timer
control Location.
•
Outdoor Temperature Sensor Location.
•
Heating System Sensor Location.
•
Output Control: Burner or Motorized Valve.
059705–00 REV. B
10
INSTALLATION INSTRUCTIONS
®
control
(see page
®
wiring
(see "Wiring" on page
(see page
33).
(see page
33).
(NOT SUPPLIED)
22).
26).
|
21
HEAT-TIMER CORP.