Vent-Axia Lo-Carbon Calido Installation & Operation Instructions page 17

Mvhr unit
Table of Contents

Advertisement

 
Installation
[13] The supply connection cable must it pre-installed before the Calido is put into place.
A: Pull the lever sideways to unlock the front panel
B: Remove the front panel to release it.
(B)
(A)
[14] The back of the unit is prepared with cable channels for cable.
There are three possible ways to assemble the connecting cable.
[15] When the unit is lifted into place:
Press the assembly against the ceiling mounting plate
against SA / EA air ducts.
The mounting plate has a hook arrangement (A) to
match the corresponding part of the unit.
The hook will help keep the unit temporarily in place
while you tighten the screws, see Figure [16].
[15]
 
C: Remove the two screws holding the terminal box cover.
Place the unit on the side and feed through a sufficient length
of cable, then fix the cable with tape pieces so it stays in place in
the channel when the unit is mounted.
[14]
(A)
(C)
[13]
Seal the entrance with sealant.
Unit
Sealing rings are pre-
installed around the
adapter to seal the gap
between adapter and duct.
17
Adapter
Duct.

Advertisement

Table of Contents
loading

This manual is also suitable for:

411133

Table of Contents