Kerlink Wirnet iBTS Installation And Maintenance Manual page 173

Table of Contents

Advertisement

Note: M4 screws are not delivered with the mounting kit.
For safety reason, the metallic mounting kit must own a good earth connection. This is
ensured by adding an earth connection through the M8 bolt and nut (see §4.6.1.2).
4.5.3.3 Pole mounting by U-bolt
The Wirnet iBTS is delivered with a U-bolt to be mounted on a pole with a maximum
diameter of 60mm.
To screw the U-bolt, it is recommended to use the nuts provided in the mounting kit.
Figure 112 : Compact casing - rear view of the pole mounting using U-bolt (no pole represented)
Classification
Internal Use
Confidential
Strict confidential
U-bolt
Figure 111 : Compact casing - Pole mount using U-bolt
U-bolt
This document is the strict property of Kerlink and shall not be either copied nor sent without express
Kerlink – 1 rue Jacqueline Auriol – 35235 THORIGNÉ-FOUILLARD
Wirnet iBTS
1 nut on each side
written authorization of Kerlink
Kerlink m2m technologies reserved rights
Document title : Installation and
Maintenance Manual
Version : 2.0
Author : SNI
Date : 04/12/2018
Page 173 / 221