Preventive Maintenance Checklist; Preventive Maintenance - VWR Mega Star 600R Service Manual

Hide thumbs Also See for Mega Star 600R:
Table of Contents

Advertisement

Account name:
Instrument model:
Instrument serial number:
Date:
Maintenance without dismantling the centrifuge
Acceptance criteria
Electrical installation
Supply voltage and main power fusing meets specifications (data plate)
Instrument plug and wall socket in good condition
Power cord insulation not damaged
Instrument socket not damaged
Location and mechanical installation
Base resonance-free and stable
Safety clearance around instrument of 30 cm
Centrifuge level
Lid lock mechanism and safety circuit
Centrifuge lid opens and closes easily and smoothly
Rubber gasket not damaged
Centrifuge lid is properly supported by gas lid stay
Centrifuge lid does not open while rotor is spinning
Cleanliness of chamber and motor cover
No particles inside spin chamber
No corrosion
Motor cover clean and not damaged
Rotors and buckets
No corrosion
No scratches
No vertical scratches (carbon fiber rotors)
Seals in good condition and sealing surfaces not scratched
AutoLock and motor shaft
No scratches
Not bent
No dents
Temperature control circuit
Condenser and air inlet slots clean
Evaporator evenly cold after 10 minutes

Preventive maintenance

checklist
Account address:
Report number:
Page: 1/2
Mega Star 600R
Pass
Fail

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mega star 600r micro

Table of Contents