Sungrow AC011E-01 Quick Installation Manual

Sungrow AC011E-01 Quick Installation Manual

Ac charger
Hide thumbs Also See for AC011E-01:

Advertisement

Quick Links

Quick Installation Guide
AC Charger
AC011E-01
www.sungrowpower.com
AC011E-01-QIEN-Ver11-202203

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AC011E-01 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sungrow AC011E-01

  • Page 1 Quick Installation Guide AC Charger AC011E-01 www.sungrowpower.com AC011E-01-QIEN-Ver11-202203...
  • Page 2 Before installing the equipment, check whether the goods are complete and consistent with the order, and whether there is obvious damage according to the packing List. Contact the shipping company or SUNGROW directly in case of any damage or incompleteness.
  • Page 3 Tools: Cable drilling tool: Marker Wire stripper Cross screwdriver Φ6/Φ12 Heat gun Crystal crimping pliers Hydraulic clamp:2.5-6mm Adjustable spanner Mounting place ≤50℃ ≥-30℃ ≤95℃ Dimensions and weight 205mm 92.4mm Name Weight AC011E-01 3.8kg (with plugs)
  • Page 4 Cable connection Note: cable shall be connected before the charger is installed. Cable cross section: 5×2.5mm ① Remove the back cover. ② Thread. ③ Crimp the terminal. (OT2.5-5) 0.5+0.1N•m ④ Connect the cable. ⑤ Install the back cover. 3+0.2N•m 0.5+0.1N•m Wall-mounted charger installation Before drilling, avoid the water and electricity wiring in the wall to prevent hazards.
  • Page 5 ② Install the socket-out .(It is recommended that the socket-out be installed at the lower right side of the charger, with a linear distance of about 20cm from the charger. The actual situation on site shall prevail.) ③ Charger installation. Wall-mounted installation effect digram.
  • Page 6 Pile-mounted charger installation (optional) The drill size isΦ12mm and the drilling depth is about 85mm. ② Pile installation(after threading). ③ Install the backplate and the ① AC line installation. socket-out. Φ12 1.2+0.1N•m ④ Install the upper hanging plate and lower hanging Pile installation effect digram.
  • Page 7 Inspection before commissioning Judgment Item The installation place is convenient for operation and maintenance. The charger is installed securely. With sufficient cooling space. Cable is connected correctly and firmly. Cables are routed safely and protected against mechanical damage. Commissioning Step 1 Confirm that all inspected items meet the requirements before commissioning; Step 2 Close the the cable inlet leakage protection circuit breaker;...
  • Page 8 More information in the QR code or at http://support.sungrowpower.com/ Specifications subject to change without notice.