Page 1
Quick Installation Guide AC Charger AC22E-01 AC22E-01-QIEN-Ver13-202309...
Page 2
Please read the user manual and relevant standards and specifications carefully before performing any operation. You can get the information by logging in Sungrow support platform via http://support.sungrow- power.com/ or scanning the QR code on the side of the product or on the back cover of the quick installation instruction.
Commission Delegated Directive (EU)2015/863 SUNGROW confi rms herewith that the products described in this document are in compliance with the fundamental requirements and other relevant provisions of the above-mentioned directives. The entire EU Declaration of Conformity can be found at support.sungrowpower.com.
Page 4
Qbdljoh!Mjtu AC Charger Backplate Socket Hexalobular socket pan Expansion screw x 9 OT Terminals x 5 head tamper proof screws x 2 Cable fastener L-shaped wrench(T10) LAN connector set x 1 RJ45 protection sleeve x 2 RFID card x 2 Euro terminals x 2 Documents Mounting pole (optional)
Marker Multimeter: ≥600 Vdc Cable drill tool: ø6、ø12 Wire stripper Hydraulic clamp:2.5-6mm 2 Cross screwdriver: M4 Rubber hammer Hot air blower Pan head tamper proof wrench set Dimensions and Weight 214mm 125mm Name Weight AC22E-01 ≤ 7 kg (with plugs)
Page 7
Xbmm.npvoufe!Dibshfs!Jotubmmbujpo Cbdlqmbuf!boe!Tpdlfu!Jotubmmbujpo Before drilling, avoid water pipes and electricity wires in the wall to prevent hazards.The drill size is Φ6mm and the drilling depth is about 45mm.The bearing capacity of the installation carrier shall be at least 4.5 times that of the charger! ø...
Page 12
Fyufsobm!Joufsgbdf B C D E F Explanation Network communication AC input from the utility grid RS485 Port 1 for connection to the Hybrid Inverter RS485 Port 2 for connection to the Smart Energy Meter Charging cable output (preinstalled) Ofuxpsl!Dpnnvojdbujpo!Dpoofdujpo Plastic interface from the bottom A: 6.604mm (REF) Shrapnel interface from the bottom B: 6.0198±0.127mm...
Page 13
ST596!Dpoofdujpo Plastic interface from the bottom A: 6.604mm (REF) Shrapnel interface from the bottom B: 6.0198±0.127mm ΔAB: 0.46~0.71mm 1.0 N•m 1.5+/-0.5 N•m Connect to a Smart Energy Meter. RS485 Port 2 Connect to an inverter(SHRT). RS485 Port 1...
Page 14
Inspection Before Commissioning Checklist Item Install an individual residual current protection device to the utility grid. The installation place is convenient for operation and maintenance. The charger is installed securely. With sufficient cooling space. • Cable is connected correctly and firmly. Cables are routed safely and protected against mechanical damage.
Page 15
Skip this step if an Ethernet cable or a SIM card is used for network connection. Login Password: SGC666 or see the 4-digit PIN on the RFID card FW!BD!Dibshfs! Qspevdu!Npefm! BD33F.12 Axxxxxxxxxx Ebuf!pg!Nbovgbduvsf!!!!!!!!!!!! 3134017019 SG-AXXXXXXXXXX WLAN password: admin123 or no password OCPP ws://europe.suncharger.cn:8098 OCPP:Stand-alone EV Charger...
Page 16
More information in the QR code or at http://support.sungrowpower.com/ Specifications subject to change without notice.
Need help?
Do you have a question about the AC22E-01 and is the answer not in the manual?
Questions and answers