3.4 Inverter Operation Mode

Waiting mode
Self-check mode
No.
Parts
1
Waiting
mode
2
Self-check
mode
3
Grid-Tied
mode
4
Faulty
mode
5
Burning
Mode
Burning Mode
Waiting stage after the inverter is powered on.
• When the conditions are met, it enters the self-check mode.
• If there is a fault, the inverter enters the fault mode.
• If a burning request is received, the inverter enters the burning mode.
Before the inverter starts up, it continuously performs self-check,
initialization, etc.
• When the conditions are met, it enters the grid-tied mode, and the
inverter starts on grid connection.
• If a burning request is received, the inverter enters the burning mode.
• If the self-check is not passed, it enters the fault mode.
The inverter is grid-tied successfully, making energy conversion and
controlling the power in PV systems.
• If a fault is detected, it enters the fault mode.
• If a burning request is received, the inverter enters the burning mode.
If a fault is detected, the inverter enters the fault mode. When the fault is
cleared, it enters the wait mode.
When the inverter is upgrading the program, it enters the burning mode.
• When the upgrading is finished, it enters the waiting mode.
User Manual V1.0-2022-08-20
Faulty mode
Grid-Tied mode
Description
8

Advertisement

Table of Contents
loading

Table of Contents