Commissioning; Contents Of The Kit; Assembling The Tool; Mounting The Solo Or Duo Vibrating Head - pellenc Olivion Power 48 P230 + SOLO Olivion head Operating Instructions Manual

Olive harvesting shaker rake
Table of Contents

Advertisement

OLIVE HARVESTING SHAKER RAKE OLIVION POWER 48 P230 / T220-300

4. COMMISSIONING

4.1. CONTENTS OF THE KIT

Make sure the kit contains:
• One Power 48 olive harvester delivered with:
• 1 tool cord clip,
• 1 operating instructions manual,
• 1 warranty card.

4.2. ASSEMBLING THE TOOL

4.2.1. MOUNTING THE SOLO OR DUO VIBRATING HEAD

To assemble the vibrating head of the Olivion Power 48 P230 / T220-300 with the pole of your choice, refer to the
mounting/assembly instructions delivered with your tool.

4.3. ADJUSTMENT OF THE T220-300 TELESCOPIC POLE

Caution
Always adjust the pole with the tool turned off.
1.
Unlock the tightening thumbwheel by turning it clock-
wise.
2.
Adjust the length of the telescopic pole according to
the working height.
18
48_151649-F

Advertisement

Table of Contents
loading

Table of Contents