Blink SemaConnect US User's Manual & Installation Instructions page 52

30kw wall mount dc fast charger
Table of Contents

Advertisement

Note:
Before switching off main breaker to begin maintenance, please record the
status code number on the LCD monitor.
After switching off the key switch the circuit before the main terminal is still
hazardous. Only visual inspection can be operated.
Maintenance of the DC Fast Charger shall be conducted only by a qualified
technician.
After opening the front door of the DC Fast Charger, turn off the main breaker
and auxiliary breaker before any maintenance work.
Replace the ventilation filter every six to twelve months.
50
semaconnect.com

Advertisement

Table of Contents
loading

Table of Contents