Installation Inspection & Commissioning - Blink SemaConnect US User's Manual & Installation Instructions

30kw wall mount dc fast charger
Table of Contents

Advertisement

3.6 Installation Inspection & Commissioning
3.6.1 Environmental Check
Item
Ambient Temperature
Ambient Humidity
Sunshade
Rain Canopy
Air Circulation / Drafty
Dust Level
Anti-Vandalism Measures
3.6.2 External Infrastructure Readiness & Check
Item
Input Wirings & Terminals
Key & Lock of Cabinet Door
Fixing Screws
No Fuse Breaker (NFB)
Residual Current Device (RCD)
Input Electricity Capacity
Input Electricity Configuration
Grounding Resistance
Grounding System
Input Voltage & Frequency
Network Connection & Quality
Status
Recommended but not
required.
Recommended but not
required.
Status
Type/ Length/ Cross
Section
Type / No
Notice:
Current rating of NFB shall
be higher than 50 Amp
Notice:
Maximum RCD residual cur-
rent shall not excess 30mA
Wye
<50 Ω
Wi-Fi , 4G > -65dBM
19
Remark
Remark
semaconnect.com

Advertisement

Table of Contents
loading

Table of Contents