Blink SemaConnect US User's Manual & Installation Instructions page 20

30kw wall mount dc fast charger
Table of Contents

Advertisement

STEP 3.
Fasten L1, L2, L3 and N wires onto the 4P terminal with M6 screws, torque
o f
c r
: e
3
0
K
f g
c .
m
torque force: 27Kgf.cm/5-15 secs. Keep proper length of each wires then fas -
ten cable grand.
STEP 4.
Fasten L1, L2, L3 and N to an external beaker. Recommended breaker spec.:
rated current shall be 50A, B Curve type; with max. Residual leakage current
(RCD) shall be 30mA, type A.
STEP 5.
Turn on the power source and operation screen will be ready within 30
seconds.
Not following installation instruction will cause charger damage.
A 50A NFB with 30mA RCD-Type A is recommended.
5 /
1 -
5
s
e
c
. s
F
a
s
e t
PE
n
P
E
i w
e r
o t
h t
e
N
L3
AWG#4 x 4
18
b
u
s
b
r a
i w
h t
M
5
s
L2
L1
semaconnect.com
c
e r
, w

Advertisement

Table of Contents
loading

Table of Contents