Hardware Checking - IEMAI Large Scale Operating Instructions Manual

Hide thumbs Also See for Large Scale:
Table of Contents

Advertisement

3.3 Hardware Checking

Step 1
M
1.
anually control the XYZ axis
movement through the touch
screen
2.
Observe whether the normal
shown
movement as
Step 2
Find the positive and negative
1.
limits of XYZ axis respectively
— 17 —
Print More Materials, All For Application
Step 3
1.
Place a sheet in the Z-axis
negative limit slot to make the
limit red light go out.
2.
Moving the Z-axis upward and
hearing a beep and no
movement of the Z-axis
indicates that the Z-positive
limit switch is normal.
Remove the sheet
3.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ym-nt-750

Table of Contents