Power Installation - IEMAI Large Scale Operating Instructions Manual

Hide thumbs Also See for Large Scale:
Table of Contents

Advertisement

3.2 Power Installation

Step 1
(Steps 1 to 3 connect the machine)
1.
Open the A end of the power
cord to the position in the
middle as shown
Step 4
1.
(Step four to step six to connect
the main switch) to get the
power cord B, find the
positioning point
Step 7
1.
Click the main power switch.
Power indicator lights up
Note: 1. Please operate carefully in the process of connecting electricity, to prevent electric shock.
2. Please use self-contained power cord, so as not to cause electric shock and fire and other adverse
Step 2
1.
Align the A positioning point
with the B positioning point on
the machine and insert it to
complete the power connection.
Step 5
1.
Open the cover of the installed
matching power A connector
(do not insert your hand or
other metal objects into the
connector)
Step 8
1.
The screen lights up normally.
Then the device is successfully
powered on
consequences.
— 16 —
Print More Materials, All For Application
Step 3
1.
Insert A to the bottom, make
sure it is in tight contact
Step 6
1.
The positioning point is facing
the A positioning hole, insert the
common connector of the
power cord
Step 9
1.
Press the internal light switch
Internal lights will on

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ym-nt-750

Table of Contents