6.1.3 Transferring patient measurements to the DTO
13
14
15
16
17T1=* C-Brace DTO
INFORMATION: The forefoot plate is available in 2
sizes (small and large). One size is pre-installed in
the orthosis and the other size is included in the
scope of delivery.
Loosen the three screws on the forefoot plate with a
T 20 Torx wrench.
INFORMATION: If the foot length is adjusted incor
rectly, the function of the joint will be impaired.
Shift or replace the forefoot plate.
In case of replacement, remove the three screws and
insert the replacement plate into the foot component.
Adjust to the patient's shoe length measurement.
The flexible section of the forefoot plate should be
between the ball of the big toe and the tip of the toe.
Tighten the 3 screws using the Torx wrench.
INFORMATION: The lower leg base tube is avail
able in 2 lengths, small (less than 47 cm) and large.
The scale on the base tube indicates the different
lengths. One size is pre-installed in the orthosis
and the other size is included in the scope of deliv
ery.
Loosen the lower leg base tube screw with a T 25 Torx
wrench.
Transfer the "MTP-floor" length measurement to the
orthosis and adjust to the patient's lower leg length.
Use a T 25 Torx wrench to tighten the screw to a tight
ening torque of 6 Nm.
Use
41