Power requirements
The DP2K-xxC operates from a nominal mono phase power net with a separate earth ground PE. A label on
the projector indicates the nominal line voltage for which the projector was set at the factory.
Projector
DP2K-12C
DP2K-15C
DP2K-20C
DP2K-12Cx
DP2K-15Cx
DP2K-20Cx
The power cord required to connect the projector with the power net is not delivered with the projector. It is the
responsibility of the customer to provide the correct type of power cord. The cross-sectional area of the
conductors in the power supply cord shall not be less than 4 mm² or 10 AWG, minimum 300V.
To protect operating personnel, the National Electrical Manufacturers Association (NEMA) recommends that
the instrument panel and cabinet be grounded. In no event shall this projector be operated without an
adequate cabinet ground connection.
The AC supply must be installed by a qualified electrician in conformance to local codes. Hardware, wire sizes
and conduit types must comply with local codes.
AIR inlet
AIR outlet
AIR outlet
AIR inlet
Power requirements
200–240 VAC, 50–60 Hz, 15 amps at 200 VAC
200–240 VAC, 50–60 Hz, 20 amps at 200 VAC
200–240 VAC, 50–60 Hz, 26 amps at 200 VAC
200–240 VAC, 50–60 Hz, 15 amps at 200 VAC
200–240 VAC, 50–60 Hz, 20 amps at 200 VAC
200–240 VAC, 50–60 Hz, 26 amps at 200 VAC
AIR inlet
R5905752 /16