Four-Post Rack Installation - Cisco CISCO7201 Installation And Configuration Manual

Cisco systems router installation and configuration guide
Table of Contents

Advertisement

Chapter 2
Installing the Cisco 7201 Router

Four-Post Rack Installation

Note
Inner clearance (the width between the inner sides of the two posts or rails) must be at least 19 inches
(48.26 cm). The height of the chassis is 1.73 inches (4.39 cm). Airflow through the chassis is from front
to back.
Figure 2-7
1
1
2
Make sure that the port adapter lever is in the locked position.
Step 1
Make sure the rack brakes are locked or the rack is stabilized.
Step 2
Position the router so the front is closest to you and lift it carefully into the rack. To prevent injury, avoid
Step 3
any sudden twists or moves.
Slide the chassis into the rack, pushing it back until the brackets meet the mounting strips or posts on
Step 4
both sides of the rack.
Keeping the brackets flush against the posts or mounting strips, align the holes in the brackets with the
Step 5
holes on the rack or mounting strip.
For each bracket, insert and tighten two 10-32 or 12-24 screws to the rack.
Step 6
This completes the procedure for installing the chassis in the rack. Proceed to the
Ground Connection" section on page 2-12
OL-11364-04
Installing the Cisco 7201 Router in a Four-Post Rack
ATM
Ci sc o 72
01
RJ4 5 EN
LINK /ACT
SFP
PA
2
SLO T 1
GE 0/0
Four-post rack
Screw hole for the cable-management bracket
V
CON SOL E
RJ4 5
EN
LINK /ACT
V
LINK /ACT
TX
SFP
V
RX
LINK /ACT
SFP
V
TX
SFP
RX
MNG MNT
USE ONL Y
GE 0/1
GE 0/2
ALA RM
GE 0/3
AUX
PWR OK
FE 0/0
FE
0
LINK
CO MP AC T
STA TUS
FLA SH
CF
ACT V
3
3
Four 10-32 or 12-24 screws
to continue the installation.
Cisco 7201 Installation and Configuration Guide
Installing the Router
"Attaching a Chassis
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cisco7201 - 7201 router7201

Table of Contents