Genie S-80HF Maintenance Manual page 81

Table of Contents

Advertisement

October 2018
SX-150 and SX-180
Note: This procedure will require 2 people to
perform.
1
Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2
Access the MACHINE STATUS menu on the
ground control box and scroll down until
LENGTH SENSOR EXTENSION is displayed.
3
Raise and extend the primary boom until the
displays reads at least 258 in / 656 cm. The
boom will be extended approximately 120 ft /
36.6 m.
4
Choose a point on the machine (i.e., contact
patch of a tire) as a visual reference for use
when crossing the start and finish lines.
5
Bring the machine to top drive speed before
reaching the start line. Begin timing when your
reference point on the machine crosses the
start line.
6
Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Specifications, Drive Speed
Specifications.
Part No. 1268489GT
Quarterly Maintenance Procedures
Z-80/60, Z-135/70 and ZX-135/70
1
Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2
Press down the foot switch and raise the
primary boom greater than 10 degrees and the
secondary boom greater than 20 degrees.
3
Z-80/60: Extend the primary boom 12 inches /
0.3 m.
Z-135/70 and ZX-135/70: Extend the primary
boom 12 inches / 0.3 m and the jib boom 12
inches / 0.3 m.
4
Choose a point on the machine (i.e., contact
patch of a tire) as a visual reference for use
when crossing the start and finish lines.
5
Bring the machine to top drive speed before
reaching the start line. Begin timing when your
reference point on the machine crosses the
start line.
6
Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Specifications, Drive Speed
Specifications.
S
®
Booms • Z
®
Booms
Maintenance Manual
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents