IDEAL TP10KAC-DX Installation & Operation Manual page 21

Two post clear floor
Table of Contents

Advertisement

B. Mount the Cable Pulley and Support Bracket on the top of the Columns. (Fig. 11c)
C. Route and adjust the cable tension so that when the handle is pressed down, both latches will be
released.
D. Install covers for both latch devices on Off Side & Main Side columns, using the provided screws.
(Figs. 12a & 12b)
Fig. 12a
(Off Side Column)
Fig. 11c
21
TP10KAC-DX
July 2018
Fig. 12b
(Main Side Column)

Advertisement

Table of Contents
loading

Table of Contents