IDEAL TP10KAC-DX Installation & Operation Manual page 19

Two post clear floor
Table of Contents

Advertisement

A. Fittings & Hoses Connections:
1.
First screw on the hose fitting connectors on the cylinder's lower end ports. (Fig. 9a)
2.
Connect the longest hose from the cylinder in Off side column to the top of Main side
column. Remember to rout the hose through the hook on cross beam. (Fig. 9b & 9c)
3.
Then from the T-fitting inside column, connect the shortest length hose directly down to
the main inside cylinder connector. (Fig. 9d)
4.
Another middle length hose from the T-fitting goes to the motor pump through a hole on
the side of the column. (Fig. 9d)
5.
Pull hoses upward taking out any slack between the cylinder fitting ports and the
cylinder mounts. Secure hoses to main side cylinder with wire tie around the T-Fitting
and the cylinder. The T-Fitting should be positioned to aim directly out through the
grommet, fig 9d. Secure Offside hose to cylinder at the same height with a wire tie.
Fig. 9a
Fig. 9c
B. Return Line Connection (blue plastic tubing)
1.
Screw in an elbow air-line fitting on the top end of the off side cylinder (Fig. 9b).
2.
Screw in another T air-line fitting on the top end of main side cylinder also. (Fig. 9c)
3.
Connect the return line from off side cylinder to main side cylinder with press-lock
fittings. The tubing section off other end of T-fitting will be routed to power unit.
Off Side Column
Main Side Column
19
TP10KAC-DX
July 2018
Fig. 9b
T-Fitting /
Grommet
Fig 9d

Advertisement

Table of Contents
loading

Table of Contents