IDEAL TP10KAC-DX Installation & Operation Manual page 12

Two post clear floor
Table of Contents

Advertisement

FOUNDATION and ANCHORING REQUIREMENTS, Fig 3
Drill holes using 3/4"
carbide tipped
masonry drill bit per
ANSI standard
B94.12.1977
2.3 Tools & Equipment Required
· 12 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent
· Chalk line and 12' Tape Measure
· Concrete hammer drill with 3/4" bit
· 11/16" open end wrench
· 3/4" open end wrench
· Torque wrench
· 15/16" deep socket or wrench
· 1-1/8" socket
· 13/16" open end wrench
· Level (18" minimum length)
· Vise grips
· Tape measure
· Funnel
· Hoist or Forklift (optional)
· Two 12' step ladders
· 1/4" drive ratchet with 5/16" socket
Clean hole.
Run nut down just
below impact section
of bolt. Drive anchor
into hole until nut and
washer contact base.
12
TP10KAC-DX
July 2018
Tighten nut with
Torque wrench to
110 ft.-lbs.

Advertisement

Table of Contents
loading

Table of Contents