Manitowoc Grove RT770E Operator's Manual page 132

Hide thumbs Also See for Grove RT770E:
Table of Contents

Advertisement

SET-UP AND INSTALLATION
6
4
Item
1
Removal Cylinders
2
Cylinder Attach Pins
3
Counterweight Attach Pins
4
6042 kg (13,300 lb) Counterweight
5
Leveling Bolts (4 places)
6
Counterweight Lifting Lugs (4 places)
9.
Adjust
the
four
(Figure 4-22) to eliminate any relative movement
between the counterweight and the turntable.
4-24
1
5 (4 places)
Description
counterweight
leveling
Published 04-04-2017, Control # 446-09
6670-1
3
bolts
The crane is now ready for operation with the counterweight
installed.
RT770E OPERATOR MANUAL
1
2
FIGURE 4-21
Leveling Bolts
FIGURE 4-22

Hide quick links:

Advertisement

Table of Contents
loading