Connecting To The Neutral Ct - GE Intellix BMT 330 Installation Manual

Bushing monitoring and partial discharge detection for transformers
Hide thumbs Also See for Intellix BMT 330:
Table of Contents

Advertisement

Table C-5: Connecting to the grounding switch
Steps
1. The central white wire must be
connected to the core connector.
2. The braid shield must be connected to
the shield connector.
3. Repeat these steps for all input phases
for the Bushing Adaptors and the
Neutral CT(s).
C.6

Connecting to the Neutral CT

Note:
At the Neutral CT end, the coaxial cable does not require terminals.
Table C-6: Connecting to the Neutral CT
Steps
1. Remove approximately 25 mm (1 in.)
of the outer jacket from the coaxial
cable (taking care not to cut the
metallic braid).
2. Un-strand the metallic braid shield
and twist it together.
3. Select one piece of heat shrink tubing
in., about 15 mm (5/8 in.) long.
3
/
16
MA-017 – BMT 330 Installation Manual – Rev 3.3
Visual
Visual
4-Mar-22
Page 47 of 69

Advertisement

Table of Contents
loading

Table of Contents