INSTALLATION
Figure 5-1 illustrates the general installation layout of an Intellix™ BMT 330 with the
required connections for a single transformer.
Figure 5-1: General installation layout - single transformer
Figure 5-2 illustrates the general installation layout of an Intellix™ BMT 330 with the
required connections for a bank of three single phase transformers.
Figure 5-2: General installation layout - Bank of 3 single phase transformers
The product is supplied with factory default settings for all parameters, e.g.
alarm thresholds. For optimal performance, specific settings are required
for each installation.
MA-017 – BMT 330 Installation Manual – Rev 3.3
4-Mar-22
Page 13 of 69