Page 1
English Technical and operational documentation SE MAX II Original instructions, issue 08/2021...
Page 2
Dear customer , thank you for purchasing a heating boiler from METAL-FACH. We hope that the operation of the device will meet your expectations and provide a lot of satisfaction. The heating boiler has been designed and manufactured in accordance with applicable norms and standards, guaranteeing safe and reliable operation. Operation with strict observance of the instructions included in the manual attached to the appliance will ensure optimal and reliable operation of the central heating boiler for many years.
List of tables: Table of contents: Introductory steps ........................3 Table 2.1 Pictograms ..........................3 Information pictograms ......................3 Table 6.1 Boiler equipment ......................... 4 The symbols used in the instruction ..................3 Table 9.1 Dimensions (mm) of the SE MAX II boiler ................8 Definitions of terms used in the instruction................
If you encounter any problems, please contact the service department or an authorised METAL-FACH service centre. These persons have appropriate training and access to original parts Large loading bay Thrust gauge for proper service and installation of METAL-FACH boilers, confirmed by a certificate issued at the Movable SDG company's headquarters. Water grate...
5. General information ATTENTION! METAL-FACH reserves the right to make changes to technical parameters, (USER) equipment and specifications of the offered goods without prior notice. The Technical and Operational Documentation is one part of the product, it is delivered together with the purchased central heating boiler. The Technical and Operating Documentation 7.
Drawing 8.2 Basic components of the SE MAX II boiler - 20kW Drawing 8.1 Basic components of the SE MAX II boiler - 15kW Description of the drawing: Blow window 16. Air dispenser Description of the drawing: Blow window 16. Scaffolding door Boiler casing Moving grate 17.
9. Podstawowe wymiary kotłów SE MAX II (UŻYTKOWNIK/INSTALATOR) Drawing 8.3 Basic components of the SE MAX II boiler --25-50 kW Opis rysunku: 14. Blow window Backfill door 15. Ashtray Cleaner's door 16. Exhaust gas throttle The grate door 17. Blower channel Ash door 18.
Drawing 9.3 Boiler dimensions SE MAX II -25-50 kW Drawing 9.2 Boiler dimensions SE MAX II - 20kW...
Page 9
Table 9.1 Dimensions (mm) of the SE MAX II boiler TYPE SE MAX II - 15 SE MAX II - 20 SE MAX II - 25 SE MAX II - 30 SE MAX II - 35 SE MAX II - 40 SE MAX II - 50 1122 1201...
10. Technical data of SE MAX II boilers (USER/INSTALLER) Table 10.1 Technical data of the SE MAX II boiler BOILER MODEL PARAMETERS UNIT S.I. SE MAX II- 15 SE MAX II- 20 SE MAX II- 25 SE MAX II- 30 SE MAX II- 35 SE MAX II- 40 SE MAX II- 50...
11. Fuel There should be a floor drain in the boiler room floor; The optimal place to store fuel is a separate room located near the boiler room; (USER) Ash and slag should be collected in appropriate containers to allow daily emptying. ...
The boiler should be placed on a heat insulating non-flammable pad, which should be 2 cm larger than the boiler base on each side. If the boiler is located in the basement, it is recommended to place it on at least 5 cm of foundation. The strength of the foundation as well as the fire protection conditions are the key guidelines when setting up the boiler in the right place: 20 cm safe distance from flammable materials;...
Boiler connection diagrams for heating system according to PN - 91/B - 02420 standard. Figure 14.2 Scheme of connection of the boiler to the heating system Drawing 14.1 Diagram of connection of the boiler to the heating system Table 14.2 Markings used in the diagrams Table 14.1 Markings used in the diagrams Designation Description...
Drawing 14.3 Connection of the boiler to the heating system Drawing 14.4 Connection of the boiler to a heating system with a ladder and a buffer. Description of the drawing: Outside the building The vessel in the collective The room controller Mixer The heater The heating circuit...
The first start-up of the boiler must be carried out only by a service technician ensured between the chimney and the nearest edge of the tree crown. trained by the manufacturer, with a current certificate from an Authorised Service Technician, a METAL-FACH Distributor, or a person with SEP qualifications up to 1.5 kW.
18. Start-up of the boiler (USER/INSTALLER) ATTENTION! Before starting to light a fire in the boiler, check if the central heating system has been made If for any reason there is a lack of water in the boiler-network system, do not correctly and if it is filled with water correctly - until it is poured out of the overflow pipe in the top up with cold water.
When adding fuel to the tank, the boiler must be switched off (position "OFF"); 21. Instructions for decommissioning the Do not use flammable liquids to light up the boiler, the boiler should light up automatically (using a lighter); boiler after its lifetime ...
Page 18
Question Answer Explanation - no draught; - seal the flue pipe entry of the flue pipe; - wrong connection between boiler and chimney; - check the chimney's permeability and its parameters; Smoke escapes from the - the remaining fuel has been hinged or sealed; another stove - check the sealant of the door;...
Conformity declaration WE/UE Manufacturer: METAL-FACH Jacek Kucharewicz Ul. Sikorskiego 66 16-100 Sokółka NIP 545-100-10-62 Product name and intended use Solid fuel steel central heating boiler with automatic feeder. Type SLIM PELLET / SLIM PELLET MINI …………………………………….Manufacturer’s number…………………………………………….. Year of production 20………………………………………...
Email - which will include a scan or photo of the report. The direction of rotation of the fan is The letter - in which a copy of the report for METAL-FACH Jacek Kucharewicz will be sent, correct. the address of the company can be found at the end of the Technical and Traffic Opening of the fan flap with blowing Document.
Page 23
Confirmation of user training in Starting date Boiler name Boiler output (kW) Factory number Comment ……………………… .. ……………………… .. ……………………… .. ……………………… .. For instructions on how to operate the boiler safely for the user, see chapter …………………………………………………… . …………………………………………………… . "19.
Email - which will include a scan or photo of the report. The letter - in which a copy of the report for METAL-FACH Jacek Kucharewicz will be sent, The direction of rotation of the fan is the address of the company can be found at the end of the Technical and Traffic correct.
Page 25
Confirmation of user training in Starting date Boiler name Boiler output (kW) Factory number Comment ……………………… .. ……………………… .. ……………………… .. ……………………… .. For instructions on how to operate the boiler safely for the user, see chapter …………………………………………………… . …………………………………………………… . "19.
Page 26
Website: www.metalfachtg.com.pl Contact with the service: Paweł Czepiel Producer: Service specialist METAL-FACH Jacek Kucharewicz Language: Russian, English st. Sikorskiego 66, 16-100 Sokółka Tel. +48 85 711 94 54 ext. 17 NIP: 545-100-10-62, REGON: 050073833 Mobile +48 663 45 32 22 www.metalfachtg.com.pl...
Need help?
Do you have a question about the SE MAX II-15 and is the answer not in the manual?
Questions and answers