General Flue Assembly Layout And Clearance Requirements - Rinnai SS850 Installation Manual

Hide thumbs Also See for SS850:
Table of Contents

Advertisement

FLUEING

GENERAL FLUE ASSEMBLY LAYOUT AND CLEARANCE REQUIREMENTS

The flue is built from the bottom up. The black sections of the flue are supported by the fire in the event of the fire
needing to be removed for maintenance, servicing etc. As the pipes are interlocking, use of sealant is optional.
For all flue options please ensure a minimum clearance of 500 mm from the roof to the underside
of the flue cowl, as per AS/NS5601.1 6.9.2
IMPORTANT
Suitable flashing (not provided)
3
Rinnai
1.
Freestanding vertical
2
2.
Freestanding vertical offset
3.
Freestanding vertical wall penetration
1
25 mm clearance
Black ceiling plate (not shown)
Black 90° bend
Visible sections of the flue are painted black
50 mm minimum rear clearance for the ceiling plate to clear the wall. Additional
clearance may be required to clear scotia
26
SS850 Freestanding IM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ss850fcanSs850fcal

Table of Contents