Step 1: Determine the installation location and heat-dissipation space
The controller requires at least 150mm of clearance above and below for proper
airflow, as shown below.
Suppose the controller is to be installed in an enclosed box. In that
case, ensuring reliable heat-dissipation through the box is
CAUTION
important.
Step 2: Connect wires according to the sequence of ① load 1-- ② load 2-- ③
battery -- ④ PV array.
Air outlet
Air inlet
1
22
2