Cisco OL-7822-06 Quick Start Manual page 9

Cisco service control engine
Table of Contents

Advertisement

Chapter 1
Prepare for Installation
An adequate chassis ground (earth) connection exists for the SCE 1000 platform.
The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches
(12.7 cm) of clearance at the rear to allow proper air flow.
Step 1
Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations
on the bottom panel of the unit.
Step 2
Place the SCE 1000 platform on the tabletop or workbench.
OL-7822-06
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
Workbench or Tabletop Installation
1-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 2xgbe

Table of Contents