Advertisement

Technical manual
SK
ATTENTION:
Do not use the equipment
Made by: Motoppar Indústria e Comércio de Automatizadores Ltda
without first reading the
Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil
manual of instructions.
CNPJ: 52.605.821/0001-55
P30345 - 07/2022
Rev. 1
www.ppa.com.br | +55 14 3407 1000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SK and is the answer not in the manual?

Questions and answers

Summary of Contents for PPA SK

  • Page 1 Made by: Motoppar Indústria e Comércio de Automatizadores Ltda without first reading the Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil manual of instructions. CNPJ: 52.605.821/0001-55 P30345 - 07/2022 Rev. 1 www.ppa.com.br | +55 14 3407 1000...
  • Page 2 INDEX IMPORTANT SAFETY INSTRUCTIONS Recommendation: For the installation of the equipment, it is important that the PPA specialized installer follow all the instructions mentioned in this technical manual and in the user manual. Equipped with the user manual, the IMPORTANT SAFETY INSTRUCTIONS ......... . . 3...
  • Page 3 TECHNICAL CHARACTERISTICS SK PREDIAL JETFLEX SK PREDIAL SK PREDIAL SK PREDIAL JETFLEX MODELO: BRUSHLESS BRUSHLESS 24V MODEL: SK JETFLEX POWER 127 V / 220 V 127 V / 220 V 127 V / 220 V 127 – 220 V POWER...
  • Page 4 TOOLS REQUIRED FOR INSTALLATION - Cable for fixed wiring must comply with NBR NM 247-3; - The power conductor, of a product for internal use, must be a flexible cable 3 x 0.75 mm²; 500 V, according to the NBR standard NM 247-5;...
  • Page 5 MEASURES FOR INSTALLATION OF FIXING BRACKETS LENGTH MAXIMUM OPERATOR LEAF SK (STANDARD) 2000 LEFT / RIGHT SK (SUPER) 3000 SK PREDIAL 2000 (STANDARD) SK PREDIAL (SUPER) 3500 SK PREDIAL (MEGA) 4500 Maximum allowable measurements for standard installation (in millimeters)
  • Page 6 INTERNAL OPENING (DOUBLE BOARD) ATTENTION: Closing Delay (RF) If the fixation support has a high dimension, it is recommended to include a French hand in order to provide greater support for the mechanical structure of the gearmotor assembly. 5th Step: Then, fit the leaf fixing bracket to the end of the plunger and secure it EXTERNAL OPENING (DOUBLE BOARD) with an M10 x 45 mm screw and an M10 hex nut (available in the kit), as shown in the figure below.
  • Page 7 NOTE: The closer the piston tip is to the end of the gate leaf, the more locking the INTERNAL: With the gate fully open, at 90°, fully withdraw (close) the plunger bringing the actuating nut to the mechanical stop. mechanical system will have, as well as requiring less force from the motor during movement.
  • Page 8 Board: Size: board manual which is available for Mounting: Fairing: download at www. ppa.com.br and Gear: perform all connections and settings. MAINTENANCE In the table below, some PROBLEMS will be mentioned — DEFECTS, PROBABLE CAUSES AND CORRECTIONS — that may occur in your Operator. Before any maintenance, it is necessary to completely disconnect the electrical network.

Table of Contents