Press "Shift" and click on the desired fields to select several fields at once. By
clicking on the respective buttons below, you can apply a command to all selected
bay units at once:
1. Open detailed views (button "Open window")
2. Start recording
3. Upload records from selected disturbance recorders (Transfer disturbance
records to computer)
4. Delete all disturbance records
Upload disturbance recorder records
Figure 17
Transferring disturbance records
In this dialog you can specify a directory for storing the records on your computer,
and whether the disturbance records are to be deleted after successful transfer. By
pressing "Upload", you initiate a single transfer.
In the lower part you can specify a repeated transfer at regular intervals. This part
is only available if "Delete disturbance recorder data" is checked.
In case the maximum number of disturbance records has been
reached, an ongoing upload of the oldest record could be interrupted
by a trigger initiating a new recording.