Installation; Support Frame - Zepro ZAHD 150/200 Installation Instructions Manual

Tail lift
Table of Contents

Advertisement

Installation

4
Installation
NOTE!
Consult the trailer manufacturer's body instructions
and Zepro's instruction booklet before installation.
m
WARNING!
Zepro tail lifts are only approved for installation
with Zepro installation kits.
4.1

Support Frame

1. Measure and mark the midpoint of the rear beam
of the trailer. See illustration.
2. Bolt or spot-weld the mounting jig (product no.
51724) to the rear beam so that both mid-points
match. See illustration.
3. Position the support frame under the trailer chassis.
4. Raise the lift arms to the highest position.
5. Attach the lift arms to the eye of the jig. Use the
normal bolts of the steel platform.
6. The support frame should be positioned as high
as possible within the specified C dimension. Ad-
just the frame to the ideal height under the trailer
chassis. A car jack is useful. If necessary adjust
the angle of the arms by carefully operating the lift.
www.zepro.com
ZAHD, ZAEHD 150/200-155/175
Image 23. Measure and mark the mid-
point of the rear beam of the trailer
Image 24. Bolt or spot-weld the mounting jig to the
rear beam. Art.no. 51724TL
Image 25. Adjust the frame to ideal height
under the fram
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zahd 155/175Zaehd 150/200Zaehd 155/175

Table of Contents