Zepro ZAHD 150/200 Installation Instructions Manual page 24

Tail lift
Table of Contents

Advertisement

Installation
5. Test the lift by carefully raising it to the vehicle floor
level and tilting it to the vertical position. Check the
position in relation to the rear beam and side posts
of the vehicle. See illustration.
NOTE!
When mounting with ZEPRO's stop strip, the distance
between the rear edge of the bridge and the vehicle
body must be 38-40 mm.
4.2.1
Adjusting the tilt angle
IMPORTANT!
Do not adjust the cylinders before they are fitted
to the platform. The tilt cylinders are preset from
the factory.
1. Loosen the rubber bellows at the bottom where
they are secured with hose clips.
2. Tilt up and move both tilt cylinders all the way up.
NOTE!
Adjustment must always take place with full hydraulic
pressure in the tilt cylinders.
3. Loosen the three lock screws on the cylinder fitted
to the platform, see illustration.
24
ZAHD, ZAEHD 150/200-155/175
Max 40 mm, Min 38 mm
Image 32. Check the position in rela-
tion to the rear beam of the vehicle
Vehicle floor level
Type
Steel
Flat 40 mm
A (mm)
70
Image 33. The platform underhang (A) varies
according to platform type, and this should be
taken into account when fitting the upper seal.
Out
In
Image 34. Adjusting the tilt angle
A
81
Lock screws x3
www.zepro.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zahd 155/175Zaehd 150/200Zaehd 155/175

Table of Contents