aerauliqa QR120P-I Installation, Use & Maintenance Manual page 22

Table of Contents

Advertisement

Available languages

Available languages

5.5 Additional electric connections
Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or
The installation and service of the unit and complete ventilation system must be performed by an authorized installer and in
The units must be earthed.
The unit is wired internally from factory.
To connect the the CTRL-V1 to the mother board use a 6-core cable: 30m max length.
Figures below show the wiring diagram.
Fig. 5.j Electrical connections on the motherboard fitted in the terminal box.
Inputs/commands
N°1 AC supply connector.
N°2 on/off inputs (volt-free contacts), for ambient sensors (named In1, In2).
N°1 6-pole connector for CTRL-V1.
22
accordance with local rules and regulations.
CTRL-V1
WARNING
electrical work!
WARNING
TRANSFORMER
(Air Quality e.g. SEN-HY)
Input
YELLOW/GREEN
BLUE
BROWN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QR120P-I and is the answer not in the manual?

Questions and answers

Table of Contents